PPG Pump Deluxe VS

New Design
17% Improved Efficiency
Lid Equipped With Led
+ 3 Years warranty
Description ...

2014.00 €
Compare products
Characteristics
 
  • Improved efficiency! The new impeller and diffuser leads to a better efficiency and increased flow rate
  • Very quiet self-priming pump with a frequency-regulated permanent magnet motor, pre-filter 3 litres.
  • Motor exceeds the current highest energy efficiency class IE3, ahead of class IE4.
  • Suction time (OFF,1-10min) and suction speed (1000-3000rpm) adjustable.
  • LED light in the lid as standard.
  • Can be placed at a maximum of 3 meters above or 3 meters below water level.
  • Equipped with 5-wire cable for external control of speed and stop function via potential-free contacts.
  • To be used in swimming pools with salt electrolysis systems with a salt concentration of 0.5% (5 grams/litre).
  PPG PUMP DELUXE VS
Capacity in m³/h (at 8 mwc/3000 rpm) 30
Power in kW (at 3000 rpm)  
- included (P1) 1,40
- issued (P2) 1,10
HP 1,60
Voltage 230
Current in Amps (at 3000 rpm) 6,1 (max)
Suction/discharge connection size (glue) 63F/63F
Weight in kg 14



Improved exclusive wet-end

Speck has developed a wet-end that is exclusive for Pollet Pool Group. During the time of conception, the emphasis was put on the 2 major challenges in the current pool industry. On the one hand, the hydraulic efficiency to optimise the electric consumption. On the other hand, the most silent operation sound. Both these features are normally enhanced by using an asynchronous inlet from the outlet. For the ease of installation of our pool builders however, we insisted on the inlet and outlet being in line. With this solution we are convinced that in this wet-end, Speck has conceived the best of both worlds.

The new impeller and diffuser leads to a 5% better efficiency and the flow rates increases by 17% compared with the previous PPG deluxe VS.



Quality management


Specks quality management system is based on the norm ISO 9001. We keep to the principles of incoming goods inspection, work instruction, final testing, traceability of shored parts and so on. Two trained quality management representatives accomplish and survey these standards. All of these issues are defined in an electronic quality management manual.